Images from September 25, 1999.


Parishes working this day
Emmanuel
St. Timothy
Grace

The major activity this week was installation of the floor underlayment.

Clicking on a small image below will give you the full size view.

Nailing underlayment Full image is 38K September 25, 1999 If you want to do a good job on installing the underlayment, you gotta coordinate your clothes!
Posed # 1 Full image is 33K September 25, 1999 Posed Picture the First.
Posed # 2 Full image is 42K September 25, 1999 Posed Picture the Second.
Side steps Full image is 68K September 25, 1999 Preparing to work on the side door steps.
Nails on floor Full image is 38K September 25, 1999 Lotsa nails to get the floor hammered down.