September 17, 2005 |
 |
Parishes working this day
Advent
Cathedral
Saint Mark
Citigroup Unit:
Citigroup
Outside, we worlked on the storage
shed and on the soffits aroing the porch. Inside, we did cabinetry,
installed doors, and laid down tile downstairs.
Click on an image below to view a larger version.

Cutting. |

Measuring before cutting. |

View of the rear including storage shed. |

Soffit installation. |

Installing doors downstairs. |

Prepping for laying floor tile. |

Laying floor tile in the basement. |

Hold a ladder (Clever Caption Award for
2005). |

Found the cabinet hardware! |

Cutting soffit material. |
|